|
The cscaulkins co. can also
help determine the best way to use a buildings' existing
equipment or combination of building supplied and window washing
contractor supplied equipment, for window washing or exterior access
purposes. When a building has all the necessary equipment
sometimes the only missing piece to the puzzle is an operational
rigging plan which in california is refered to as an OPOS (Operations
Procedure Outline Sheet).
Our
company can provide a rigging plan thats specific for your building and
meets code. Such a plan is necessary for correctly & safely
rigging window washing equipment on the building. (Please click
on our link below in Resources
under opos
for more information)
|